Side frames on the floor, then stand them, add joists, and rip the panel strips.
A frame table for the X1 Ultra
Two long 2×6 rails, two end rails, six joists on 16 in centers, six 4×4 legs, a lower 2×4 ring, two plywood end panels, and a three-piece plywood top. You and a helper build each long side flat on the floor, stand the sides up, and tie the ends. Each side frame is about 50 lb. The machine’s long walls are heavier: three people on a wall, and a lift table if one is over about 150 lb. The 12 ft boards need a longer vehicle or a delivery.
One shop plan
| Day | Work | Done when |
|---|---|---|
| 1 | Pick the straightest boards and cut. Two side frames, then end rails and joists. Rip the panel strips. Steps 1–4. | The box stands, the six joists are in, and the panel strips are set aside. |
| 2 | Level, end panels, three plywood pieces, sand the seams, then the push test. Steps 5–8. | The top is flush, and you know if the frame leans. |
| 3 | Outline, the steel plates, the egg-crate, then assemble the machine on the deck. Steps 9–12. | The ring is together on the plywood. The bed still lifts off. |
| 4 | Hook-up and buffer. Chiller, exhaust, level, push test again, smoke test. Step 13. | You can leave it for the night. |
Level, end panels, three plywood pieces, sand the seams, then the push test.
Outline, the steel plates, the egg-crate, then assemble the machine on the deck.
Chiller, exhaust, level, push test again, and a smoke test.
Why it does not sway or sag
The machine and the bed sit on the plywood, the plywood sits on joists every 16 inches, the joists sit in two long rails, and those rails are bolted to six legs that run straight down to the levelers. Why the middle legs matter: the long rails are only strong enough with the middle legs bearing; do not skip them. Each plywood seam lands on a joist center, so every sheet edge has wood under it. The end panels and the lower 2×4 ring keep the ends from leaning, and the plywood ties the top into one sheet. When it is standing, push the deck sideways with about 50 lb. Add a pair of panels on the long sides only if you can see or feel it lean, or the level bubble moves. Repeat that push once the machine is on.
The laser bed
The bed is two 1.5 mm steel fire plates, each 1200 × 1200 mm, with two laser-cut steel egg-crate panels on top. Each panel is 1200 × 1200 mm, 24 blades and 7 ribs, 38 mm tall. The blades and ribs interlock, and nothing is fastened between them. The Bed tab has the model and the cut files.
The stack is about 40 mm: 38 mm of egg-crate on a 1.5 mm plate. Z travel is about 80 mm. It is not yet known whether focus height is measured from the machine bottom, so a way to raise or lower the machine may be needed. That question is still open with ACMER.
Lay the two plates on the open frame and fix them to it. Set the two egg-crate panels on top, side by side, and fasten them through the bottom or with semi-permanent clips. Nothing is fastened in the work area.
The six levelers level the deck. After the panels are on, check the head height at the corners and the middle.
The CNC waste board is later: two pieces of ¾ in MDF, about 48 × 48 in, screwed along the joist lines. The panels and the plates come off for CNC and for cleaning. Buy the MDF on CNC day.
The machine is 2834 × 1630 × 341 mm (111.6 × 64.2 × 13.4 in) and about 550 lb. It has an open bottom and no feet. This deck is 113.5 × 66 in, so the ring sits fully on the plywood, about 0.95 in in from each end and 0.9 in in from each long side.
Shop & cut list
A 2×4 is 1½ × 3½, a 2×6 is 1½ × 5½, a 4×4 is 3½ × 3½, and ¾ plywood is 23/32, about 0.72 in thick. The frame is a mirror image left to right and front to back.
Shopping list
Cut list
How the boards break down
Hardware
| Item | Qty | Where it goes |
|---|---|---|
| 3½ in structural screws | About 60 | Rails, joists, lower ring |
| #8 × 2 in plywood screws | About 170–220 | Plywood to the frame, plus two screws into each leg top. 2 in still has bite after the sheet. |
| ½ × 6 in carriage bolts, washers, nuts | 28 (use 26) | Washer and nut on the inside face of the leg. On the top rail they sit 2 in and 4¼ in below the rail top. 6 in leaves thread past the 1.5 in rail and the 3.5 in leg. |
| Steel swivel levelers, at least 1,000 lb, with a pad | 6 | One per leg. Measure mid-travel before you cut. |
| Felt or rubber pads | 6 | Under every foot, on the coated slab |
| Wood glue | 1 | Joists, rails, and the plywood top |
| 4 ft straightedge and shim stock | 1 | Seam check on the top |
| Steel fire plate | 2 | 1200 × 1200 mm, 16 ga |
| Egg-crate steel panel | 2 | 1200 × 1200 mm, 1/8 in steel, laser cut from the Bed files |
| ¾ in MDF, 4×8 | Later | CNC waste board only. Two pieces, about 48 × 48. Buy it on CNC day. |
Tools
- Circular saw and a straightedge or a track saw. A table saw is not required.
- Speed square, framing square, tape, pencil.
- Drill/driver. Bits: ⅛ in pilot, a ½ in bit at least 6 in long (or an extension), a Torx or star bit for the structural screws, and a countersink.
- A wrench or socket for the nuts (¾ in for a ½ nut) and for the leveler nuts.
- A 4 ft level, a 4 ft straightedge, and a 2 ft level. Shim stock. Four clamps. Two or three sawhorses. A blanket for the floor.
- Safety glasses, hearing protection, dust mask.
Site and safety
- Coated slab. Pads under every foot. Lift, do not drag.
- About 48 in of clear aisle along one long side.
- Two people for the sheets and for standing the side frames. Each side is about 50 lb.
- The 12 ft boards need a longer vehicle or a delivery.
- The machine’s power draw is still unknown, so do not size a new circuit yet.
FAQ & specs
Confirmed vs. still unknown about the machine
| Item | What we have | |
|---|---|---|
| Confirmed | Work area | 1250 × 2450 mm (49.2 × 96.5 in), about 80 mm of Z travel |
| Confirmed | Machine size | 2834 × 1630 × 341 mm (111.6 × 64.2 × 13.4 in). About 550 lb. The 113.5 × 66 in deck carries the whole ring, about 0.95 in in from each end and 0.9 in in from each side. |
| Confirmed | Feet | None. Open bottom. The ring sits on the plywood. |
| Confirmed | Cooling | Separate water-chiller cabinet. Compressor, tank, screen, and E-stop are on that cabinet. It wants 5–40 °C indoors, so heat the garage in winter. |
| Confirmed | CNC spindle | 200 W, 52 mm body |
| Confirmed | Exhaust | One port on the rear profile, 130 × 125 × 70 mm. Leave at least 24 in clear behind that end and keep the duct run short. |
| Confirmed | How it ships | Left and right walls, front and rear ends, an X-axis beam, and a sliding door, joined with M4 and M5 screws. Weigh each piece. Three people per long wall. Never lift the assembled ring. |
| Confirmed | Bed stack | Two 1.5 mm steel fire plates, each 1200 × 1200 mm, then two egg-crate panels, each 1200 × 1200 mm and 38 mm tall. The stack is about 40 mm. Z travel is about 80 mm. It is not yet known whether focus height is measured from the machine bottom, so a way to raise or lower the machine may be needed. That question is still open with ACMER. See the Bed tab. |
| Unknown, asked of ACMER | Power and bottom vents | Not published. Long sides stay open until vents are known. |
Floor and a twisted board
- Point loads from the levelers are fine on the coated slab. Pads go under every foot.
- A twisted 2×6 can be a joist, crown up, if the screws pull it to the line. Do not make it a long rail.
- If your leveler is not 2.5 in at mid-travel, recut the legs. Leg length is the top height, minus 0.72 in of plywood, minus the leveler you measured.
- After about a month, check the level and tighten the bolts. The bed can be shimmed if the top is a little off.
Changing the height
The plywood top is one number in this file: TOP_H = 36, near the top of the script. Leg length, the end panels, and the 4×4 count follow it. The 40 mm bed puts the work surface about 1.6 in higher.